Day 73

We need to get our shit together, and quickly. This mob are not slowing down in the quest to build our house, and we need to start organising quotes for our decks and verandah as well as the driveway.
We have the curtain people coming around next week, as well as the landscapers to quote up.
The internal carpentry has been completed, the feature brickwork is done as well as the conecting of the downpipes. On our weekly snoop we have realised the painters have been and have covered the internals with plastic in preperation to paint the place.
Theatre entrance with the cavity sliding door.
Looking towards the throne.
Kitchen/Family area all covered.
Both bathroom and ensuite shower bases have been installed.
Ensuite with the stone base cut in.
Vanity sinks will be undermount like the above.
Vanity Taps
Looking out from the master to the hallway.
Robe Cabinets all covered up.
Kitchen area looking towards the retreat.
Down pipes are now connected. The little undercover area leads out from the ensuite, and will be decked.
The mortar is becoming lighter with time.