Saturday, August 8, 2009

Day 107

Temp Fencing Gone........or blown away from the winds the other day!!!
Alfrescao area looking into the Kitchen Family Area.
Family Room.
Hall Cupboards. They all have now been fitted out.
Kids Bathroom with the stone benchtop installed.
Laundry with tap ware installed.
Ensuite Alfresco
Ensuite - Stone Benchtop installed.

Monday, August 3, 2009

Not far to go....

Should not be long now until we get the call for the PCI. They have completed the electrical fit off and have completed most of the final plumbing. The doors have been re hung and it seems like the have completed the builders clean on the house. What still is left to go: Stone Bench Tops. Undermount sinks and taps through out the house. Appliances. Glass Splasback External painting Render colour Painting touch ups through the house. Carpet.
Family Room tiles. Kids Retreat
One of the minor bedrooms
Wardrobe and door handles.
Party Esky
Kids Shower
Throne room. The toilet is not straight!!

Saturday, July 25, 2009

Day 93

Tiles are now complete, and the ducted heating and cooling ducts have been installed. The electricians have been back in and have started the final fit off. Still waiting for tall the bench tops to be installed.
Ensuite tiles - The free standing bath is going in front of this wall Ensuite Vanity
Main Hallway
Family Room
Kitchen - The bulkhead above the kitchen cabinets is being built this week.
Evap Cooling Unit - It is huge but well hidden by the roof line from the front.

Thursday, July 23, 2009

Render..

Well they have started the render work. Render will be two colours - Woodland Grey & Dune. It seems like they have completed the tiling, and hopefuly should get some shots over the weekend.

Saturday, July 18, 2009

Tiling has commenced.......

How the mighty can fall........... I hate being a Collingwood supporter some times.
Anyway...... This weekend did the usual flyby of the house and the tiling has commenced. Eynesbury is starting to get a move on in terms of the number of houses being built, and residents are starting to move into their new homes. Hopefully they open the local store by the time we move in.

Looking down towards the kitchen/family room from the entrance.

Tiling around the kitchen island bench.

Family room. Tiles are 400x400 ceramic, mochca colour.

Rear roller in surfmist. Garage door and eaves are surfmist. This goes against the other colours chosen for the house. The roof/gutters/facia/render are either Woodland Grey or Dune. I am not convinced with surfmist, but as I said before apparently I am colour blind.

Thursday, July 16, 2009

Day 84........

The painting of the internals is well underway and they are doing a neat job. The bricks have now been cleaned, so the rendering can start soon. The tiles have beed delivered and are waiting to be layed. We have finalised the quote for the driveway and decking ( I should have become a chippie)
Facade minus render Garage doors have been installed. The garage door colour is surfmist.
Bathroom. Waiting for the benchtop!!
Lots of tiles.
Ensuite tiles - 600x300 porcelains (Ivory)
The rest od the tiling is 400 x400 in a mocha colour.
Wall colour is China White with the skirtings and the ceilings in Lexicon Quarter. The better half could not decide on feature wall colours or wall paper so she kept it basic.
Cleaned slimline bricks.

Sunday, July 5, 2009

Day 73

We need to get our shit together, and quickly. This mob are not slowing down in the quest to build our house, and we need to start organising quotes for our decks and verandah as well as the driveway.
We have the curtain people coming around next week, as well as the landscapers to quote up.
The internal carpentry has been completed, the feature brickwork is done as well as the conecting of the downpipes. On our weekly snoop we have realised the painters have been and have covered the internals with plastic in preperation to paint the place.
Theatre entrance with the cavity sliding door.
Looking towards the throne.
Kitchen/Family area all covered.
Both bathroom and ensuite shower bases have been installed.
Ensuite with the stone base cut in.
Vanity sinks will be undermount like the above.
Vanity Taps
Looking out from the master to the hallway.
Robe Cabinets all covered up.
Kitchen area looking towards the retreat.
Down pipes are now connected. The little undercover area leads out from the ensuite, and will be decked.
The mortar is becoming lighter with time.